• West Best Railroad Grade Separation projects (3 Underpass designs ~$92 million)
• Regional Commuter Rail Feasibility Study
• 2008 Intersection Redesign Construction Contract (15 locations)
• 2011 Traffic Signal Construction Contract Group A (12 locations)
• 2011 Traffic Signal Construction Contract Group B (15 locations)
• 2009 Intersection Safety Design Contract (12 locations)
• Candlelight Oaks Railroad Quiet Zone (8 crossings)
• Washington Ave Railroad Quiet Zone (7 crossings)
• First Ward Quiet Zone (3 crossings)
• East End I Railroad Quiet Zone (8 crossings)
• Federal Signal Program projects at Railroad Crossings (multiple locations)
• 2012 Intersection Redesign Contract (5 locations)
• 2011 Intersection Redesign Work Order contract (8 locations)
• 2011 Intersection Safety improvement contract (5 locations)
• 2012 Hughes Rd Paving and Drainage (2 mile street reconstruction)
• 2013-2017 Railroad Coordinator for 30+ Infrastructure Projects
• 2012 Smart Arterials Design Contract
• 2014 HATTS design contract (15 traffic signals, 3 ITS Fiber Corridors)
• 2011 CBD ITS Communication Design Project
• Westheimer /Elgin Paving and Drainage (roadway reconstruction)
• Antoine Dr Paving and Drainage (roadway reconstruction)
• 2015-2017 Traffic Signal Design projects (30 locations)
• 2015-2017 Intersection Redesign project (30 locations)
• 2016-2017 Council District Service Fund Project Coordinator (92 locations)
• Parking Guidance / DMS project